BASE PERMT INFO
Plan Review Deposit:
Yes
Land Development/Site Work Included:
Yes
Scope Code:
M1 Multi Family Building
Application Square Footage:
784080
SITE DEVELOPMENT
Site Inspection Multi Family:
Yes
Pipe Inspection Storm 12+ Inches:
3626
Pipe Inspection Sanitary 8+ Inches:
1346
Pipe Inspection Storm & Sanitary Structures:
71
Sewer Connection Inspection Multi Family:
1
Driveway Inspection:
60
Sidewalk Inspection:
454
Curb & Gutter Inspection:
518
NPDES:
Yes
Total Acreage:
22.8
Disturbed Acreage:
19.8
Performance Bond Req'd:
Yes
Amt/Acre:
3000
Cut and Fill:
268118
Excavation Bond Req'd:
Yes
Bond Amount:
0
State Waters:
Yes
Flood Zone:
No
Flood Zone2:
No
Wetlands:
No
Sewer Tap Form Required:
Yes
Stormwater Mgmt Facilities Required:
Yes
Dedicated Infrastructure:
No
ZONING
NPU:
R
SPI Zoning:
SPI
Beltline District:
undefined
CDP Land Use:
MDR
Council District:
11
District:
14
Land Lot:
253
Zoning 1:
SPI-20 SA2
Historic Building and Properties:
undefined
Flood Zone 1:
X
Flood Zone 2:
undefined
RECOMPENSE TYPE
Recompense Type:
Maximum Recompense
RECOMPENSE DATA
Number of trees destroyed:
2550
DBH trees destroyed:
33188
Number of trees replaced:
191
TCI trees replaced:
573
Acreage Cleared:
19.77
GENERAL ARBORIST INFO
Buildable trees destroyed:
2290
Buildable DBH destroyed:
29797
Buildable comments:
see sampling method for trees per acre
General Comments:
Sampling method used to determine rate of trees per acre, then applied to rate for maximum recompense.