项目描述: | The SFMTA Walkfirst Pedestrian Countdown Signals # 1 project aims to improve signal visibility and/or pedestrian crossings at the 17 locations throughout the city.
The scope of w ork includes the installation of new vehicular signals, pedestrian countdown signals, underground conduit, pull boxes, signal poles, controller cabinets, and accessible pedestrian signals at existing signalized intersections. The maximum excavation is eleven (11) feet for the signal pole foundations, eighteen (18) inches for the pull boxes, sixteen (16) inches for the cabinet foundation, and twenty-four (24) inches for the underground conduits.
In addition, Six (6) foot wide sidewalk bulb-outs are proposed for the northeast and southwest corners of 22nd Street and South Van Ness Avenue, removing one (1) metered and two (2) unmetered parking spaces. Five (5) foot wide sidewalk bulb-outs are proposed for the northwest, southwest, and southeast corners of Acton Street Mission Street and Sickles Avenue, w ith no impact to parking. |
|