Return to SF Planning
登入
繁體中文 (TW)
Español (MX)
English (US)
简体中文 (CN)
|
註冊帳戶
|
其他
其他
Message Bar
許可證
2016-002811ENV
:
Environmental (ENV)
記錄狀態:
Closed - CEQA Clearance Issued
有效日期:
01/31/2016
加到現有收藏
--選擇--
1st submittal
JanNeufeld
建立新收藏
*
名稱:
說明:
添加
取消
記錄資訊
許可證詳細資訊
處理狀態
相關許可證
附件
條件
工作地點
許可證詳細資訊
專案說明:
The proposed project involves a new 850-foot long, 20-inch diameter pipeline for the Auxiliary Water Supply System (AWSS) with five new underground vaults adjacent to Clarendon Avenue in the Twin Peaks neighborhood, as well as an aboveground air gap and panel enclosure located within the right-of-way (but outside of the roadway) of Dellbrook Avenue and La Avanzada Street. This area is located northwest of the Summit Reservoir (Summit Reservoir Water Facilities) and approximately 250 from the Existing Palo Alto Pump Station, both of which provide potable water to high-elevation areas of the City. The new pipeline trench would be dug approximately 12-feet deep and 4-feet wide. The five new underground vaults would reach a maximum of 10-feet deep and would measure 48-inches by 48-inches. The new aboveground air gap and panel enclosure with be constructed within a 10-foot long, 20-foot wide, and 10-foot tall fenced-in area. A 1-foot wide perimeter around the fenced area would be graded to direct stormwater toward the nearest catch basin. The proposed project also involves the motorization of one existing AWSS open-control gate valve, located at the eastern corner of Twin Peaks Boulevard at Clarendon Avenue, changing it from local manual operation to remote-controlled motorized operation. The existing 6-foot by 6-foot concrete valve vault in Twin Peaks Boulevard would be demolished and replaced with a new vault measuring 7-feet by 9-feet. A new below-grade battery vault (4-feet wide by 6-feet long by 3-feet deep), controller pedestal (3-feet wide by 3-feet long by 4-feet tall), antenna pole, and PG&E electric meter pedestal would be installed within the sidewalk alignment. The maximum depth of excavation for these facilities would be 11 feet.
詳細資訊
相關連絡人
Billing Contact資訊
Scott
MacPherson
SFPUC
525 Golden Gate Ave
San Francisco, CA, 94102
住家電話:
(415) 551-4525
電子郵件:
smacphearson@sfwater.org
申請資訊
PROJECT INFORMATION
Alteration:
否
Demolition:
否
Excavation-Soil Disturbance:
是
Tree Planting and Protection Checklist:
否
Shadow:
否
Wind:
否
Hazardous Materials:
否
Preservation and Cultural Info
Historic Preservation Rating:
Not Applicable
申請資訊表格
ENVIRONMENTAL INFORMATION
Review Type:
Public Project Exemption
Publication Date:
03/04/2016
地塊資訊
No parcel information
附件
允許的檔案大小上限是
150 MB
。
ade;adp;bat;chm;cmd;com;cpl;exe;hta;htm;html;ins;isp;jar;js;jse;lib;lnk;mde;mht;mhtml;msc;msp;mst;php;pif;scr;sct;shb;sys;vb;vbe;vbs;vxd;wsc;wsf;wsh
是禁止上傳的檔案類型。
檢視人員附件
檢視記錄附件
如果您看到此文字,表示瀏覽器不支援 IFRAME。在瀏覽器內
檢視此內嵌框架的內容
。
*
儲存
添加
如要上傳檔案,您必須安裝 Silverlight。按一下下圖,開始下載 Silverlight。
抱歉,您的瀏覽器不支援 IFRAME;請嘗試支援 W3 標準的瀏覽器。
全部移除
自訂元件
處理狀態
載入中...
載入中...
相關許可證
檢視整個樹狀目錄 »
載入中...
通行權管理
No ROWM data available at this time.
Type
Owner
Contact
Email
Address
Start Date
End Date
Status
ROWM Website
抱歉,您的瀏覽器不支援 IFRAME;請嘗試支援 W3 標準的瀏覽器。
載入中...
您的瀏覽器不支援 JavaScript。