Return to SF Planning
登入
繁體中文 (TW)
Español (MX)
English (US)
简体中文 (CN)
|
註冊帳戶
|
其他
其他
Message Bar
許可證
2016-003161ENV
:
Environmental (ENV)
記錄狀態:
Closed - CEQA Clearance Issued
有效日期:
01/31/2016
加到現有收藏
--選擇--
1st submittal
JanNeufeld
建立新收藏
*
名稱:
說明:
添加
取消
記錄資訊
許可證詳細資訊
處理狀態
相關許可證
附件
條件
工作地點
許可證詳細資訊
專案說明:
The proposed project involves the replacement of a 570-foot segment of the Sunset Reservoir Branch of the San Andreas Pipeline Number 2 (which is 54"-diameter potable water pipeline) in a new alignment through Stern Grove Park, using trenchless construction methods. Thirty six mature trees would be removed and replaced elsewhere at locations selected by the Park Arborist that are outside of the proposed new pipeline alignment so as to conform with the SFPUC's Integrated Vegetation Management Policy. The project also involves the replacement or modification of various appurtenances on the Sunset Supply Pipeline in the City of South San Francisco and in the Town of Colma (see Table 1 of the SFPUC's Categorical Exemption Request letter), which would be carried out by accessing existing facilities via existing underground vaults (no excavation previously undisturbed soils would be required). In addition, the project involves improvements to the existing San Andreas Pipeline Numbers 2 and 3 in the Parkside District of San Francisco (identified in Table 2 of the SFPUC's Categorical Exemption Request letter). Of these additional project elements, only the 570-foot segment through Stern Grove Park would require the excavation of a new alignment (no excavation of previously undisturbed soils would be required for the other items listed in Table 2).
詳細資訊
相關連絡人
Billing Contact資訊
Barry
Pearl
SFPUC
525 Golden Gate Ave.
San Francisco, CA, 94102
住家電話:
(415) 551-4573
電子郵件:
bpearl@sfwater.org
申請資訊
PROJECT INFORMATION
Alteration:
否
Demolition:
否
Excavation-Soil Disturbance:
是
Tree Planting and Protection Checklist:
否
Shadow:
否
Wind:
否
Hazardous Materials:
否
Preservation and Cultural Info
Historic Preservation Rating:
Not Applicable
申請資訊表格
ENVIRONMENTAL INFORMATION
Review Type:
Public Project Exemption
Publication Date:
10/13/2016
Case Desc:
Class 1
DEPOSIT
Receipt #:
20005139
Deposit Date:
11/30/2016
Receipt #:
20005206
Deposit Date:
01/31/2017
地塊資訊
No parcel information
附件
允許的檔案大小上限是
150 MB
。
ade;adp;bat;chm;cmd;com;cpl;exe;hta;htm;html;ins;isp;jar;js;jse;lib;lnk;mde;mht;mhtml;msc;msp;mst;php;pif;scr;sct;shb;sys;vb;vbe;vbs;vxd;wsc;wsf;wsh
是禁止上傳的檔案類型。
檢視人員附件
檢視記錄附件
如果您看到此文字,表示瀏覽器不支援 IFRAME。在瀏覽器內
檢視此內嵌框架的內容
。
*
儲存
添加
如要上傳檔案,您必須安裝 Silverlight。按一下下圖,開始下載 Silverlight。
抱歉,您的瀏覽器不支援 IFRAME;請嘗試支援 W3 標準的瀏覽器。
全部移除
自訂元件
處理狀態
載入中...
載入中...
相關許可證
檢視整個樹狀目錄 »
載入中...
通行權管理
No ROWM data available at this time.
Type
Owner
Contact
Email
Address
Start Date
End Date
Status
ROWM Website
抱歉,您的瀏覽器不支援 IFRAME;請嘗試支援 W3 標準的瀏覽器。
載入中...
您的瀏覽器不支援 JavaScript。