Return to SF Planning
登入
繁體中文 (TW)
Español (MX)
English (US)
简体中文 (CN)
|
註冊帳戶
|
其他
其他
Message Bar
許可證
2019-006672ENV
:
Environmental (ENV)
記錄狀態:
Closed - CEQA Clearance Issued
有效日期:
01/31/2019
加到現有收藏
--選擇--
1st submittal
JanNeufeld
建立新收藏
*
名稱:
說明:
添加
取消
記錄資訊
許可證詳細資訊
處理狀態
相關許可證
附件
條件
工作地點
許可證詳細資訊
專案說明:
The proposed project would help reduce flooding along populated areas on Cesar Chavez Street between Guerrero and Hampshire Streets. The project would install an auxiliary sewer to connect the existing combined Marin Street sewer to the existing 20-foot reinforced concrete box sewer to the east to increase wet weather conveyance capacity. SFPUC proposes microtunneling installation of approximately 856 feet of 96-inch diameter fiberglass pipeline (FRP) and two junction structures to connect to the existing sewer structures on either side.
詳細資訊
相關連絡人
Billing Contact資訊
Brett
Becker
SFPUC
525 Golden Gate Ave., 6th floor
San Francisco, CA, 94102
住家電話:
(415) 554-1650
電子郵件:
bbecker@sfwater.org
申請資訊
PROJECT INFORMATION
Construction Cost:
0
Initiating Agency:
Public Utilities Commission
Alteration:
否
Demolition:
否
Excavation-Soil Disturbance:
是
Tree Planting and Protection Checklist:
否
Shadow:
否
Wind:
否
Hazardous Materials:
是
申請資訊表格
ENVIRONMENTAL INFORMATION
Review Type:
Public Project Exemption
Publication Date:
06/03/2019
Case Desc:
Class 3
地塊資訊
No parcel information
附件
允許的檔案大小上限是
150 MB
。
ade;adp;bat;chm;cmd;com;cpl;exe;hta;htm;html;ins;isp;jar;js;jse;lib;lnk;mde;mht;mhtml;msc;msp;mst;php;pif;scr;sct;shb;sys;vb;vbe;vbs;vxd;wsc;wsf;wsh
是禁止上傳的檔案類型。
檢視人員附件
檢視記錄附件
如果您看到此文字,表示瀏覽器不支援 IFRAME。在瀏覽器內
檢視此內嵌框架的內容
。
*
儲存
添加
如要上傳檔案,您必須安裝 Silverlight。按一下下圖,開始下載 Silverlight。
抱歉,您的瀏覽器不支援 IFRAME;請嘗試支援 W3 標準的瀏覽器。
全部移除
自訂元件
處理狀態
載入中...
載入中...
相關許可證
檢視整個樹狀目錄 »
載入中...
通行權管理
No ROWM data available at this time.
Type
Owner
Contact
Email
Address
Start Date
End Date
Status
ROWM Website
抱歉,您的瀏覽器不支援 IFRAME;請嘗試支援 W3 標準的瀏覽器。
載入中...
您的瀏覽器不支援 JavaScript。