Return to SF Planning
登入
繁體中文 (TW)
Español (MX)
English (US)
简体中文 (CN)
|
註冊帳戶
|
其他
其他
Message Bar
許可證
2019-016498ENV
:
Environmental (ENV)
記錄狀態:
Closed - CEQA Clearance Issued
有效日期:
01/31/2019
加到現有收藏
--選擇--
1st submittal
JanNeufeld
建立新收藏
*
名稱:
說明:
添加
取消
記錄資訊
許可證詳細資訊
處理狀態
相關許可證
附件
條件
工作地點
許可證詳細資訊
專案說明:
The San Francisco Municipal Transportation Agency (SFMTA) Director of Transportation proposes to approve a Task Order for emergency maintenance work in the Twin Peaks Tunnel in the vicinity of the old Eureka Station between the Castro and Forest Hill stations. The scope of work would consist of the removal and replacement of a fouled, damaged ballast with a new ballast and tampering to stabilize the track in the Twin Peaks tunnel. Various rail components and equipment would remain the same as previously used and the Automatic Train Control System (ATCS) would be protected in place. Traffic control measures would be undertaken for the unloading and loading of equipment at the Eureka portal and all work would be completed within non-revenue service hours over three days. This work would be within the existing tunnel footprint and would involve no excavation.
詳細資訊
相關連絡人
Billing Contact資訊
Forrest
Chamberlain
SFMTA
申請資訊
PROJECT INFORMATION
Initiating Agency:
MTA Special Work Order
Excavation Below Grade:
0
申請資訊表格
ENVIRONMENTAL INFORMATION
Review Type:
Public Project Exemption
Publication Date:
01/03/2020
Case Desc:
Using Close Date
地塊資訊
No parcel information
附件
允許的檔案大小上限是
150 MB
。
ade;adp;bat;chm;cmd;com;cpl;exe;hta;htm;html;ins;isp;jar;js;jse;lib;lnk;mde;mht;mhtml;msc;msp;mst;php;pif;scr;sct;shb;sys;vb;vbe;vbs;vxd;wsc;wsf;wsh
是禁止上傳的檔案類型。
檢視人員附件
檢視記錄附件
如果您看到此文字,表示瀏覽器不支援 IFRAME。在瀏覽器內
檢視此內嵌框架的內容
。
*
儲存
添加
如要上傳檔案,您必須安裝 Silverlight。按一下下圖,開始下載 Silverlight。
抱歉,您的瀏覽器不支援 IFRAME;請嘗試支援 W3 標準的瀏覽器。
全部移除
自訂元件
處理狀態
載入中...
載入中...
相關許可證
檢視整個樹狀目錄 »
載入中...
通行權管理
No ROWM data available at this time.
Type
Owner
Contact
Email
Address
Start Date
End Date
Status
ROWM Website
抱歉,您的瀏覽器不支援 IFRAME;請嘗試支援 W3 標準的瀏覽器。
載入中...
您的瀏覽器不支援 JavaScript。