Return to SF Planning
登入
繁體中文 (TW)
Español (MX)
English (US)
简体中文 (CN)
|
註冊帳戶
|
其他
其他
Message Bar
許可證
2020-003882ENV
:
Environmental (ENV)
記錄狀態:
Closed - CEQA Clearance Issued
有效日期:
01/31/2020
加到現有收藏
--選擇--
1st submittal
JanNeufeld
建立新收藏
*
名稱:
說明:
添加
取消
記錄資訊
許可證詳細資訊
處理狀態
相關許可證
附件
條件
工作地點
許可證詳細資訊
專案說明:
In 2016, the SFMTA initiated the Twin Peaks Figure 8 Pilot Project, which introduced vehicle restrictions on the Twin Peaks Boulevard Figure 8 and repurposed roadway space for a bike- and pedestrian-only right of way. The 2016 pilot project received environmental clearance as a Class 6 categorical exemption (Case No. 2016-000117ENV). In April 2018, the SFMTA Board of Directors approved a two-year extension of the Pilot, this two year extension received a Class 1 categorical exemption (Case No. 2018-002084ENV) through May 31, 2020 for additional outreach. The proposed Twin Peaks Figure 8 Project (project) is the permanent continuation of the Pilot project (Pilot), with no changes to the Pilot. The SFMTA now proposes to make the piloted conditions permanent. There are no other differences between the Pilot (initiated in 2016) and the proposed project (proposed now). The Pilot has already implemented all of the proposed traffic and parking regulations in the project area. This exemption would cover the proposed SFMTA Board approval of a permanent project. The project would continue the two lane, two-way configuration of Twin Peaks Boulevard that closes one section of the Figure 8. The lanes on the west side of the peaks would continue two-way operation with a single lane in each direction. Both lanes of Twin Peaks Boulevard on the east side of the peaks from Christmas Tree Point Road to the southern end of the Figure 8 would remain closed to motor vehicles. ROAD CLOSED signs and physical barriers will remain at the intersections to ensure that motor vehicles do not find their way onto the closed portion. The intersection at Twin Peaks Boulevard and Christmas Tree Point Road would remain slightly reconfigured given the two-way operation, as in the Pilot. The STOP sign stopping Christmas Tree Point Road would remain unchanged with the project.
詳細資訊
相關連絡人
Billing Contact資訊
Melinda
Hue
申請資訊
PROJECT INFORMATION
Initiating Agency:
MTA Special Work Order
Excavation Below Grade:
0
申請資訊表格
ENVIRONMENTAL INFORMATION
Review Type:
Public Project Exemption
Publication Date:
04/15/2020
Case Desc:
Using Close Date
地塊資訊
No parcel information
附件
允許的檔案大小上限是
150 MB
。
ade;adp;bat;chm;cmd;com;cpl;exe;hta;htm;html;ins;isp;jar;js;jse;lib;lnk;mde;mht;mhtml;msc;msp;mst;php;pif;scr;sct;shb;sys;vb;vbe;vbs;vxd;wsc;wsf;wsh
是禁止上傳的檔案類型。
檢視人員附件
檢視記錄附件
如果您看到此文字,表示瀏覽器不支援 IFRAME。在瀏覽器內
檢視此內嵌框架的內容
。
*
儲存
添加
如要上傳檔案,您必須安裝 Silverlight。按一下下圖,開始下載 Silverlight。
抱歉,您的瀏覽器不支援 IFRAME;請嘗試支援 W3 標準的瀏覽器。
全部移除
自訂元件
處理狀態
載入中...
載入中...
相關許可證
檢視整個樹狀目錄 »
載入中...
通行權管理
No ROWM data available at this time.
Type
Owner
Contact
Email
Address
Start Date
End Date
Status
ROWM Website
抱歉,您的瀏覽器不支援 IFRAME;請嘗試支援 W3 標準的瀏覽器。
載入中...
您的瀏覽器不支援 JavaScript。