GENERAL INFORMATION
Is this a revision to an approved set of plans (RTAP)?:
No
Site Area Acres:
1.34
Is Site on an NCDOT (State) Maintained Road?:
No
Jurisdiction:
Charlotte
Development Type:
Subdivision
Subdivision Type:
Multi-family
Multi-Family Type:
Apartment
Number of Multi-family units:
328
Are you utilizing conservation development standards:
Yes
Is this is a compact subdivision?:
No
Disturbed Acreage :
1.5
Is this a Housing Trust Fund Project?:
No
Is there an associated conditional rezoning?:
No
UDO Primary Zoning:
UE Uptown Edge Zoning District
ZONING INFORMATION
Does this project require a UDO bonus?:
Yes
UDO Bonus Presubmittal Meeting Record ID:
LDPSM-2025-00049
Affordable Housing:
Yes
Electric Vehicle Charging Stations:
Yes
High Performance Construction:
Yes
New Street Connection/Multimodal Mitigation/TDM Mitigation:
Yes
CATS INFORMATION
Is this project along an existing bus route?:
Yes
Is the project directly along an existing light rail line?:
No
Is this project along an existing light rail line?:
Yes
URBAN FORESTRY
Do you have existing ROW trees?:
No
Is this site requiring tree protection fencing?:
No
Do you have any Heritage trees?:
No
Do you have previously approved Tree save?:
No
STORM WATER
Does the site have an SCM/BMP?:
Yes
Does the FEMA/Community Floodplain exist on the parcel(s)?:
No
Does this site have any walls for the SCM or Culverts?:
No
Does this site propose any grading off of the subject site?:
No
Does this project impact any stream/wetlands?:
No
Does this project impact a Water Quality/SWIM Buffer?:
No
Does this project require a Storm water 100+1 study?:
No
Does this project impact an existing Storm Water SDE?:
No
CDOT INFORMATION
What is the centerline length of new sidewalk along arterials?:
490
Are project limits within 350 FT radius of an existing traffic signal?:
Yes
Does project modify an existing traffic signal?:
No
Does this project modify or add an Interchange?:
No
Does project modify or add a bridge?:
No
Does project modify or add a culvert wider than 20 linear feet?:
No
What is the trip generation for the project?:
620
Is a traffic impact study required for this site?:
No
Is a Transportation Demand Management Assessment required for this site:
Yes
Input the number of transportation demand mitigation points required:
2
Is there a number of Multi-Modal mitigation points required for this site? :
Yes
Input the number of Multi-Modal mitigation points required:
5
Are there off-site transportation improvements (including any form of monetary commitments) required?:
No
Have the off-site transportation improvement commitments been satisfied?:
No
Is this site adding new curb ramps or replacing existing curb ramps?:
No
CHARLOTTE WATER INFORMATION
Water/Sewer provider:
Charlotte Water
Does this project modify or propose a pump station?:
No
Does this project involve a low-pressure sewer?:
No
Is this project missing valid preliminary CAP approval from the last six months?:
No
Will this project propose any railroad encroachments?:
No
EXPEDITED REVIEW INFORMATION
Are you seeking an Expedited Review process?:
No
PLAN ROOM ACKNOWLEDGEMENT
I acknowledge that I will upload plans, supporting documentation, and attachments following the submission of my application.:
Yes