ADVISORY COMMENTS |
Type: note Title: Garbage/Recycle Description: The development are single family detached homes eligible for City of Charlotte garbage/recycle carts. Please note the truck is automated with the collection arm on the right side of the truck. Please reach out to SWS Operations on cart placement for service. Operations Supervisor Noble Scott noble.scott@charlottenc.gov 704-516-9149 Discipline: Solid Waste Status: Open Target: RZ-2.0 CreatedByName: Mavis Gant CreatedDate: 4/29/2022 12:54PM LastUpdateBy: Mavis Gant LastUpdatedDate: 4/29/2022 12:54PM |
Type: condition Title: 2021-278 Description: Label all sheets rezoning petition 2021-278 Discipline: Entitlement Services Status: Open Target: RZ-3.0 CreatedByName: Claire Lyte-Graham CreatedDate: 5/25/2022 5:01PM LastUpdateBy: Claire Lyte-Graham LastUpdatedDate: 5/25/2022 5:01PM |
Type: condition Title: Proposed Zoning Description: Revise Site Development Data to note proposed zoning is R-6(CD). Discipline: Entitlement Services Status: Open Target: RZ-3.0 CreatedByName: Claire Lyte-Graham CreatedDate: 5/25/2022 5:02PM LastUpdateBy: Claire Lyte-Graham LastUpdatedDate: 5/25/2022 5:02PM |
Type: condition Title: Crossing Description: Through recent community engagement, residents in the area have requested a safe crossing of Harrisburg Road to access the park/golf course properties on the west side of the street. MCPR requests a signalized crossing of Harrisburg Road with pedestrian accommodation.
Contact MCPR with any questions/comments: Katie.Lloyd@MeckNC.gov Discipline: Parks and Rec Status: Open Target: RZ-2.0 CreatedByName: Katie Lloyd CreatedDate: 5/17/2022 9:46AM LastUpdateBy: Katie Lloyd LastUpdatedDate: 5/17/2022 9:46AM |
Type: condition Title: Driveway Description: Show existing park driveway and align the roadway with the existing driveway. Discipline: Parks and Rec Status: Open Target: RZ-2.0 CreatedByName: Katie Lloyd CreatedDate: 5/17/2022 9:48AM LastUpdateBy: Katie Lloyd LastUpdatedDate: 5/17/2022 9:48AM |
Type: note Title: Notes Description: Summary: Due to the limited treatment capacity with WSACC, Charlotte Water will not accept applications for plan review, Capacity Assurance Program review or Pre-Capacity Assurance (previously Willingness to Serve) review in the capacity-limited basins. This pause on acceptance of new capacity requests is temporary and until more capacity becomes available. Customers can sign up at charlottewater.org to be notified of program updates.
Development is encouraged to contact Installation Development Services at (704) 336-5499 to review service connection design requirements and City Ordinances (e.g., backflow, separate meter Ordinance, public/private pipeline extensions). Comments: Has direct access to sewer. Has direct access to water. Contact CLT Water New Services Department for water/sewer services. Contact CLT Water Donated Projects if public infrastructure will be extended through property.
Reservation of sanitary sewer system capacity through the Charlotte Waterâโฌโขs Capacity Assurance Program is the responsibility of the customer/development. Contact the New Services Group at
(704) 432-2854 for further information on reserving capacity up to 24 months.
Discipline: Charlotte Water Status: Open CreatedByName: Jaevan Evans CreatedDate: 5/24/2022 2:54PM LastUpdateBy: Jaevan Evans LastUpdatedDate: 5/24/2022 2:54PM |
Type: condition Title: Conditional Description: If you are going to include a siteplan then this should be a conditional plan Discipline: Subdivision Status: Open Target: RZ-3.0 CreatedByName: Josh Weaver CreatedDate: 5/10/2022 1:39PM LastUpdateBy: Josh Weaver LastUpdatedDate: 5/26/2022 3:28PM |
Type: condition Title: reverse frontage buffer Description: 12.308 requires a 30' reversfrontage bufffer and a 20' rearyard from the buffer Discipline: Subdivision Status: Open Target: RZ-2.0 CreatedByName: Josh Weaver CreatedDate: 5/10/2022 1:41PM LastUpdateBy: Josh Weaver LastUpdatedDate: 5/26/2022 3:28PM |
Type: condition Title: General Provisions Description: First paragraph under GENERAL PROVISIONS should reference tax parcels as included in this rezoning. Discipline: Entitlement Services Status: Open Target: RZ-3.0 CreatedByName: Claire Lyte-Graham CreatedDate: 5/25/2022 5:04PM LastUpdateBy: Claire Lyte-Graham LastUpdatedDate: 5/25/2022 5:04PM |
Type: condition Title: Reverse Frontage (Sec. 12.308) Description: Lots 1-5 are subject to Sec. 12.308 (reverse frontage), requiring a common open space strip a minimum of 30' in width and a minimum 20' rear yard measured from the interior edge of the common open space strip. Please reference above referenced section for additional guidance. Label on site plan. Discipline: Entitlement Services Status: Open Target: RZ-2.0 CreatedByName: Claire Lyte-Graham CreatedDate: 5/25/2022 5:21PM LastUpdateBy: Claire Lyte-Graham LastUpdatedDate: 5/25/2022 5:22PM |
Type: condition Title: Potential Stormwater FAcility Description: Petitioner should add a note committing to install approved plantings that will serve to be an enhancement to the potential stormwater facility and overall development. Discipline: Entitlement Services Status: Open Target: RZ-2.0 CreatedByName: Claire Lyte-Graham CreatedDate: 5/25/2022 5:24PM LastUpdateBy: Claire Lyte-Graham LastUpdatedDate: 5/25/2022 5:24PM |
Type: condition Title: Remove notes, not required on rezoning plan. These are design guidelines that will be implemented via PCSO compliance Discipline: Engineering Status: Open Target: RZ-3.0 CreatedByName: Brendan Smith CreatedDate: 5/23/2022 1:22PM LastUpdateBy: Brendan Smith LastUpdatedDate: 5/23/2022 1:23PM |
Type: condition Title: Remove note, not required to be included on rezoning plan Discipline: Engineering Status: Open Target: RZ-2.0 CreatedByName: Brendan Smith CreatedDate: 5/23/2022 1:23PM LastUpdateBy: Brendan Smith LastUpdatedDate: 5/23/2022 1:23PM |
Type: condition Title: Tree Save Description: Site must provide a min of 10% tree save that is comprised of existing tree canopy. Discipline: Urban Forestry Arborist Status: Open Target: RZ-3.0 CreatedByName: Henry Kunzig CreatedDate: 5/12/2022 4:12PM LastUpdateBy: Henry Kunzig LastUpdatedDate: 5/12/2022 4:13PM |
Type: condition Title: Tree Ordinance Description: Please add note stating "Site shall comply with the Charlotte Tree Ordinance" Discipline: Urban Forestry Arborist Status: Open Target: RZ-3.0 CreatedByName: Henry Kunzig CreatedDate: 5/12/2022 4:13PM LastUpdateBy: Henry Kunzig LastUpdatedDate: 5/12/2022 4:13PM |
Type: condition Title: Remove Note Description: Please remove the following notes from the plan sheets:
âโฌ¢ RZ-2.0 which states: Should the required storm water facility not be located on site, the lots, as shown may be reconfigured to accommodate open space and additional lots per the approved zoning.
Discipline: Stormwater Status: Open Target: RZ-2.0 CreatedByName: Doug Lozner CreatedDate: 5/26/2022 10:19AM LastUpdateBy: Doug Lozner LastUpdatedDate: 5/26/2022 10:19AM |
Type: condition Title: Remove Notes Description: Please remove the following notes from the plan sheets:
âโฌ¢ RZ-3.0: The second paragraph under section 7 (Environmental Features), including bullets A-D.
âโฌ¢ RZ-3.0: The third paragraph under section 7 (Environmental Features).
Discipline: Stormwater Status: Open Target: RZ-3.0 CreatedByName: Doug Lozner CreatedDate: 5/26/2022 10:19AM LastUpdateBy: Doug Lozner LastUpdatedDate: 5/26/2022 10:19AM |
Type: condition Title: Storm Water Impacts Description: This property drains to McKee Creek, which is an impaired/degraded stream, and may contribute to downstream flooding. This project has the opportunity to mitigate future impacts to this stream, therefore, Storm Water recommends placing the following notes on the plan:
(I) Storm Water Quality Treatment
For defined watersheds greater than 10% built-upon area (BUA), construct water quality stormwater control measures (SCMs) designed for the runoff generated from the first 1-inch of rainfall for all new and redeveloped BUA associated with the project. SCMs must be designed and constructed in accordance with the Charlotte-Mecklenburg BMP Design Manual.
(II) Volume and Peak Control
For defined watersheds greater than 10% built-upon area, control the entire volume for the 1-year, 24-hour storm for all new and redeveloped BUA associated with the project. Runoff volume drawdown time shall be in accordance with the Charlotte-Mecklenburg BMP Design Manual.
For commercial projects with greater than 10% BUA, control the peak to not exceed the predevelopment runoff rates for the 10-yr, 6-hr storm and perform a downstream flood analysis to determine whether additional peak control is needed and if so, for what level of storm frequency, or if a downstream analysis is not performed, control the peak for the 10-yr and 25-yr, 6-hour storms.
For residential projects with greater than 10% BUA, control the peak to not exceed the predevelopment runoff rates for the 10-year and 25-year, 6-hour storms or perform a downstream analysis to determine whether peak control is needed, and if so, for what level of storm frequency.
Staff is available to discuss mitigation options prior to the rezoning plan approval should the project have practical constraints that preclude providing the above referenced stormwater management.
Discipline: Stormwater Status: Open Target: RZ-3.0 CreatedByName: Doug Lozner CreatedDate: 5/26/2022 10:20AM LastUpdateBy: Doug Lozner LastUpdatedDate: 5/26/2022 10:20AM |