RM Strutural Conditions
New structural drawing sets were submitted in response to our plan review. These sets are enclosed and should replace any previous sets submitted with the original permit submittal. The new drawing sets are dated January 8, 2019.
Special Inspections, Submittals, Tests, and Structural Observation
Requirements for geotechnical special inspections and tests, structural special inspections, structural deferred submittals, structural tests, and structural submittals have been provided on Sheet S1.0 of the structural general notes. Special inspections and tests should be performed by qualified special inspectors. Reports, certificates, and other documents related to structural special inspections and tests should be submitted to King County.
Structural Observation: Structural observation during construction is required for this project per IBC Section 1704.6.
Corrections and comments made during the review process do not relieve the permit applicant or the designers from compliance with code requirements, conditions of approval, and permit requirements; nor are the designers relieved of responsibility for a complete design in accordance with the laws of the state of Washington. This review is for general compliance with the International Building Code as it relates to the project.
Applied | Notice | 01/24/2019