Information to resolve the H795 inspection
o H795 inspection required = The project proposes to construct new water infrastructure for a proposed 64-unit apartment complex at 301 State Street (parcel 012-131-01).
-----------------------------------------------------------
To resolve the H795 inspection, the applicant or primary contact or contractor shall email the following information to ehsplanreview@washoecounty.us: -----
>>> Documentation from the water company affirming that construction is complete and complies with code. -----
>>> The passing backflow test report for the single 3-inch domestic RPPA backflow, the single 4-inch fire DCDA backflow and the single 0.75-inch irrigation RPPA backflow assembly – here is an example of a backflow test report === https://tmwa.com/wp-content/uploads/docs/Customer_Services/Backflow/TEST_FORM_20080421.pdf. -----
>>> Photographs showing that the single 3-inch domestic RPPA backflow, the single 4-inch fire DCDA backflow and the single 0.75-inch irrigation RPPA backflow assembly are installed. -----
>>> The as-built construction documents if the design on the plans change. -----
Include permit number BLD21-04302 and an explanation in the subject line of the email.
-----------------------------------------------------------
Use this link to schedule a construction inspection with the Health District = https://forms.washoecounty.us/f/PermitInspectionRequest -----
Use this email to resolve a construction inspection that is scheduled with the Health District = ehsplanreview@washoecounty.us ------
https://nvbpels.org/pdfs/2020-BLUE-BOOK.pdf
Applied | Notice | 02/24/2021