JOB VALUE
Job Value:
77000000
ACTIVITY TYPE
New Commercial Building Infeasibility Waiver Application:
No
New Residential Building (Single Family, Duplex or Halfplex Structures):
No
APPLICATION TYPE
Planning Entitlement:
Yes
Building Permit Submittal Clearance:
No
Infeasibility Waiver Application:
No
SCOPE OF WORK
Applicant Scope of Work:
New construction of a 256 unit 8-story apartment building
INFEASIBILITY WAIVER QUESTIONS
Ground floor food service establishment for the area of the building with cooking equipment. The building official shall grant the exemption only for fuel gas piping, fixtures, or infrastructure necessary for cooking equipment within the designated food service area. :
No
Manufacturing or industrial facilities for the area of the building with process loads. The building official shall grant this exemption only for the area of the building with process loads.:
No
Water heating systems and equipment in regulated affordable housing for those portions of the building where virtual net energy metering is unavailable. A sign off is required by SMUD if this limited exemption box is checked. The signed form must be included in the building application packet.:
No
Water heating systems and equipment in regulated affordable housing for those portions of the building where virtual net energy metering is unavailable. A sign off is required by SMUD if this limited exemption box is checked. The signed form must be included in the building application packet.:
No
I have a qualifying letter from SMUD that the infrastructure is not available to be all electric:
No