ADDRESS VALIDATION
Do you have an address for the project site?:
Yes
CE CASE VALIDATION
Is there a code enforcement violation case on this site?:
No
MINISTERIAL INFO
Define the scope of the work:
INSTALL (16) STALL ELECTRIC VEHICLE CHARGING STATION AND INFASTRUCTURE
What is the processing timeline requested for this application?:
Express
Applicant Type:
Authorized Agent of Property Owner or Other Person per M.C Section 112.0102
MEP SPECIFIC
Select permit type:
Electrical Permit
Are you submitting a permit for Electric Vehicle Charging Stations (EVCS):
Yes
Are you proposing to install a rooftop-mounted solar photovoltaic (PV) system for a single-family home or duplex structure that does not require a building permit per Information Bulletin 301:
No
Select the property type:
Non-SDU/Duplex
HISTORIC DESIGNATION
Does the project contain a designated historic resource, or is it located within a designated historic district?:
No
List the year constructed for all the structures on the project site:
1983
Does your proposed construction include work on a site containing buildings or structures 45 years old or older in which there will be a change to the exterior of the existing buildings or structures?:
No
PROJECT INFORMATION
Application Opened Date:
02/21/2024
Application Expiration Date:
09/11/2025
Declaration
I have and will maintain a certificate of consent to self-insure for workers’ compensation, issued by the Director of Industrial Relations as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued OR will maintain workers’ compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued.:
No
I certify that, in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workers’ compensation laws of California, and agree that, if I should become subject to the workers’ compensation provisions of Section 3700 of the Labor Code, I shall forthwith comply with those provisions.:
No
To be determined at the time of permit issuance:
Yes
GEOGRAPHIC INFORMATION
Overlay Zone: Airport Land Use Compatibility:
NAS North IslandSan Diego International Airport
Overlay Zone: Coastal Height Limitation:
12/07/1972, CHLOZ, O-10960 NS
Overlay Zone: Residential Tandem Parking:
11/09/2018, RTPOZ, O-20991
Overlay Zone: Transit Area:
03/17/2005, TAOZ, O-19289 NS
Airports: Airport Influence Areas:
San Diego International Airport, Review Area 1NAS North Island, Review Area 2
Airports: ALUCP Noise Contours (CNEL):
San Diego International Airport 60 - 65 CNEL
Airports: FAA Part 77 Noticing Area:
65 to 70 feet elevation above sea level // 5000 to 5500 feet horizontal distance from runway, SDIA - Lindbergh Field60 to 65 feet elevation above sea level // 4500 to 5000 feet horizontal distance from runway, SDIA - Lindbergh Field171 to 176 feet elevation above sea level // 14500 to 15000 feet horizontal distance from runway, North Island NAS176 to 181 feet elevation above sea level // 15000 to 15500 feet horizontal distance from runway, North Island NAS
Environmental: ASBS:
false
Environmental: FEMA Floodways & Floodplains:
X, F, AREA OF MINIMAL FLOOD HAZARD
Environmental: Hydrologic Unit:
PUEBLO SAN DIEGO
Environmental: La Jolla Shores Archaeological Study Area:
false
Environmental: Non-Coastal Wetlands:
false
Environmental: Slopes 25% or greater (1999):
1
Environmental: Storm Water: Environmentally Sensitive Areas:
false
Environmental: Vernal Pools:
false
Environmental: Watershed:
PUEBLO SAN DIEGO
Environmental: Watershed Subarea:
Lindbergh, San Diego Mesa, 908.21
Fire: Brush Management:
false
Fire: Very High Fire Hazard Severity Zones:
false
Geology: Alquist-Priolo Earthquake Fault Zone:
false
Geology: Earthquake Fault Buffers:
false
Geology: Geologic Hazards:
LIQUEFACTION-High Potential-shallow groundwater major drainages, hydraulic fills, 31
Schools: Unified School Districts:
UNIFIED SAN DIEGO