Applicant: | Individual Sarah Holt 4806 50th SW Seattle, WA, 98116 |
|
|
Project Description: | The proposed project will replace the existing timber and concrete bulkhead with an angular rock bulkhead, which is designed to protect the existing single-family residence from shoreline erosion caused by significant wind- and wave-action at this location. The purpose of the project is to perform necessary maintenance to the existing timber and concrete bulkhead by replacing it with an angular rock bulkhead. A properly functioning bulkhead is required to protect the home and associated infrastructure from significant wave- and wind driven erosion of the shoreline in this high energy marine environment. |
|
Owner: | Sarah Holt *9400 SW Dolphin Poi * | 4806 50th SW | SEATTLE WA 98116 |
|
|
|